4x4 VW Polo 2

The Suzuki gearbox tunnel was fitted. You can also see the new seat frames welded into place.
The bulkhead had to move some 4" into the cab to allow room for the inline engine.
All welded together and fitted to the chassis.
Using the top half of the tailgate to make the rear of the cab.

BACK.
NEXT.